Line 153: Line 153:
   * Materials: looking for local suppliers   * Materials: looking for local suppliers
   * __Discussing drying methods__:   * __Discussing drying methods__:
-  * Excluding hydrocyclone +    * Excluding hydrocyclone 
-  * The best distiller was the one without an extra heater +    * The best distiller was the one without an extra heater 
-  * UV-protection +    * UV-protection 
-  * The dryer should be automated to its maximum extend+    * The dryer should be automated to its maximum extend
   * __Agreeing on doing 2 experiments__:   * __Agreeing on doing 2 experiments__:
-  * Are algae magnetic? +    * Are algae magnetic? 
-  * Can we charge algae and attract them with the opposite charge?+    * Can we charge algae and attract them with the opposite charge?
  
 ==== 4th Meeting (2013-03-21) ==== ==== 4th Meeting (2013-03-21) ====
Line 261: Line 261:
   * Purchase   * Purchase
  
 +=== Minutes: === 
 +  * Arduino: set up 
 +  * Discussing budget 
 +  * To do: connection motor and blinds (if polymer: Joao Francisco (jfs) F327, if metal: Fernando Ferreira (fjf) F329) 
 +  * To do: adding relays to budget
  
 ==== 11th Meeting (2013-05-16) ==== ==== 11th Meeting (2013-05-16) ====
Line 268: Line 272:
   * Ultra sound sensor test - results   * Ultra sound sensor test - results
   * Stepmotor - blinds connection   * Stepmotor - blinds connection
 +
 +=== Minutes: ===
 +
 +  * General remake: update the wiki (not only in word) with our corrections of the intrim report
 +  * What we need: construction for capacitor
 +  * Has the solar panel 20V output?
 +  * Will it work if lower voltage (12V)? But it will just take longer. → TEST
 +  * Maybe higher voltage is better because it will take less time, less time is less energy. Because it is an electrostatic charge
 +  * Not only taking pictures but measure the density → more scientific
 +  * Test different kind of algae with capacitor
 +  * Ultrasound test: problem sensor: 1cm was the lowest measured point. Solution: change software (x.10 / 58 → to mm)
 +  * Work on our group: only 2 people attended this meeting
 +
 +
 +==== 12th Meeting (2013-05-23) ====
 +=== Agenda: ===
 +  * Charging test
 +  * Ultra sound sensor test
 +  * Stepmotor - blinds connection
 +  * Place to assemble everything? 
 +  * Electrical wires
 +
 +=== Minutes: ===
 +  * Discussing results tests: tests were successful
 +  * Solution steppermotor connection: protect rubber from UV
 +  * If we need tools: let the supervisors know
 +  * To do: Support sensor, Rails blinds, Email Benedita if she can switch her male for female wires
 +
 +
 +==== 13th Meeting (2013-05-30) ====
 +=== Agenda: ===
 +  - Is there any template for User Manual? 
 +  - Arranging meeting for writing the program
 +  - Plexiglass
 +
 +=== Minutes: ===
 +  * User manual:
 +    * How to connect and switch on/off
 +    * How to interface → Functionalities
 +  * Discussing the programming
 +  * Final presentation: 
 +    * Integrate sustainability, ethics and deontology and marketing. Just one slide per subject
 +    * 15 min (5min for demo)
 +
 +
 +==== 14th Meeting (2013-06-06) ====
 +=== Agenda: ===
 +
 +  - Can we ask for help with connecting all the electrical appliances?
 +  - Printed report: when do we have to hand it in?
 +
 +=== Minute: ===
 +
 +  * Solution glue: chloroform
 +  * Pushed deadlines: not for us (uploading monday is good too)
 +  * Connection electrical components: if we have a scheme of it they can help us
 +  * Printed report: after last feedback
 +
 +
 ===== Activities ===== ===== Activities =====
 //Please register here all project activities// //Please register here all project activities//
Line 303: Line 366:
 |2013-05-21|2013-05-21|Purchase|Purchasing of materials|Benedicte, Paul| |2013-05-21|2013-05-21|Purchase|Purchasing of materials|Benedicte, Paul|
 |2013-05-22|2013-05-22|Test|Ultra sound sensor with amended software|Bartek, Sven| |2013-05-22|2013-05-22|Test|Ultra sound sensor with amended software|Bartek, Sven|
 +|2013-06-03|2013-06-03|Meeting|Meeting with João Francisco concerning assembling of the tank| Ola|
 +|2013-06-03|2013-06-03|Meeting|Group meeting, working on the project together| Team 1|
 +|2013-06-03|2013-06-03|Assembling|Connecting wheels to the pallet| Bartek, Ola|
 +|2013-06-03|2013-06-03|Meeting|Benedita's advice on programming| Bartek, Ola|
 +|2013-06-04|2013-06-04|Meeting|Working on the deliverables|Paul, Sven, Benedicte|
 +|2013-06-05|2013-06-05|Meeting|Assembling the report|Sven, Paul|